2018 Water Main Replacement Project

Phase: Planning

Anticipated Construction Start Date: Fall 2018

Project Description

This is part of an annual program to replace old water mains and repair sewer deficiencies. Generally water mains that are over 60 years old and have a history of water main breaks or leaks are prioritized for replacement over time. The project includes replacement of the water main, fire hydrants, and new water services to properties within the project limits. The 2018 project included the following streets:

  • Beamer Street between Walnut St. and Elm St.
  • Grand Avenue between Clover St. and Beamer St.
  • Walnut Street between Court St. and Beamer St.
  • Locust Street between Clover St. and Beamer St.
  • Elm Street between Clover St. and Beamer St.
  • College Street between Clover St. and Beamer St.