Sec. 25-26-30. Setbacks.

On any lot where a plan line for a future street or for the extension of an existing street has been established under this article, or is established after the effective date of this chapter, required setbacks for buildings and/or structures as designated by the zone in which the property is located, shall be measured from said plan line. (Amended during the March 2009 supplement.)