CIP 20-01 & 20-08
Phase: Complete
Construction Completion: Summer 2023
Project Description
This project improved a two mile-long corridor on Gibson Road from County Road 98 to East Street. The improvements include:
- Rehabilitating pavement
- Restriping narrower travel lanes to slow traffic
- Adding buffered bike lanes
- Constructing ADA-compliant curb ramps and sidewalk repairs
- Installing drainage improvements
- Completing traffic signal improvements to include bicycle and pedestrian actuation
The project also installed a pedestrian-actuated lighted crossing at California Street and lane reconfigurations or “Road Diet” that will reduce travel lanes between Cottonwood Street and West Street from four lanes to a three lane corridor consisting of two narrow travel lanes and a two-way left turn lane.
These improvements transformed this segment of Gibson Road into a complete street providing improved bicycle, pedestrian, and vehicle facilities to ensure the corridor meets the needs of all modes of travel.